Residential dwellings
|
- Plumbing outside services - Installation of building storm sewer and sanitary sewer and water service pipe
- Readiness to pour footings - Readiness to pour footings with formwork and reinforcing in place prior to placing concrete
- Plumbing rough-in under slab - Installation of underground building storm drain, sanitary drain, and water supply
- Prior to backfill - Substantial completion of footings and foundations, including drainage and damp-proofing prior to commencement of backfilling
- Structural framing - Substantial completion of structural framing after heating and ventilation, mechanical, and plumbing rough-in with windows and roofing in place
- Plumbing rough-in above slab - Installation of drainage system, venting system, and the water distribution system throughout the building.
- HVAC rough-in - Substantial completion of all ductwork and cold air return spaces
- Insulation, vapor barrier and air barrier - Substantial completion of the insulation, vapor barrier, and air barrier prior to covering
- Fire separations and closures - Substantial completion of all framing, batt insulation, and resilient channel required of a fire separation, prior to installing fire rated drywall
- Garage ceiling/floor insulation - Substantial completion of the insulation and vapor barriers in ceiling of garage and any floor over unheated space, prior to covering
- Fire protection occupancy - Completion of fire alarm, sprinkler, emergency lighting, and standpipe systems
- Plumbing occupancy - Installation of required plumbing fixtures and plumbing appliances as required to permit occupancy, as required by the Ontario Building Code
- HVAC occupancy - Installation of required heating and ventilation appliances as required to permit occupancy, as required by the Ontario Building Code
- Occupancy - Completion of the construction and installation of components required to permit occupancy, as required by the Ontario Building Code
|
Finished basements, additions or renovations
|
- Readiness to pour footings - Readiness to pour footings with formwork and reinforcing in place prior to placing concrete.
- Plumbing rough-in under slab - Installation of underground building storm drain, sanitary drain, and water supply
- Prior to backfill - Substantial completion of structural framing after heating and ventilation, mechanical, and plumbing rough-in with windows and roofing in place
- Structural framing - Substantial completion of structural framing after heating and ventilation, mechanical, and plumbing rough-in with windows and roofing in place
- Plumbing rough-in above slab - Installation of drainage system, venting system, and the water distribution system throughout the building
- HVAC rough-in - Substantial completion of all ductwork and cold air return spaces
- Insulation, vapor barrier and air barrier - Substantial completion of the insulation, vapor barrier, and air barrier prior to covering
- Fire separations and closures - Substantial completion of all framing, batt insulation, and resilient channel required of a fire separation, prior to installing fire rated drywall
- Fire protection occupancy - Completion of fire alarm, sprinkler, emergency lighting, and standpipe system
- Plumbing occupancy - Installation of required plumbing fixtures and plumbing appliances as required to permit occupancy, as required by the Ontario Building Code
- HVAC occupancy - Installation of required heating and ventilation appliances as required to permit occupancy, as required by the Ontario Building Code
- Occupancy - Completion of the construction and installation of components required to permit occupancy, as required by the Ontario Building Code
|
Accessory building
|
- Readiness to pour footings - Readiness to pour footings with formwork and reinforcing in place prior to placing concrete
- Prior to backfill - Substantial completion of structural framing after heating and ventilation, mechanical, and plumbing rough-in with windows and roofing in place
- Structural framing - Substantial completion of structural framing after heating and ventilation, mechanical, and plumbing rough-in with windows and roofing in place
- HVAC rough-in - Substantial completion of all ductwork and cold air return spaces
- Plumbing rough-in under slab - Installation of underground building storm drain, sanitary drain, and water supply
- Plumbing rough-in above slab - Installation of drainage system, venting system, and the water distribution system throughout the building
- Insulation, vapor barrier and air barrier - Substantial completion of the insulation, vapor barrier, and air barrier prior to covering
- HVAC occupancy - Installation of required heating and ventilation appliances as required to permit occupancy, as required by the Ontario Building Code
- Plumbing occupancy - Installation of required plumbing fixtures and plumbing appliances as required to permit occupancy, as required by the Ontario Building Code
- Occupancy - Completion of the construction and installation of components required to permit occupancy, as required by the Ontario Building Code
|
Decks
|
- Readiness to construct footings - Readiness to pour footings with formwork and reinforcing in place prior to placing concrete
- Structural framing - Substantial completion of structural framing
- Occupancy - Completion of the construction and installation of components required to permit occupancy, as required by the Ontario Building Code
|
Industrial, commercial, or institutional
|
- Readiness to construct footings - Readiness to construct footings with formwork and reinforcing in place prior to placing concrete
- Damp proofing layer -
- Drainage layer prior to backfill - Substantial completion of footings and foundations, including drainage and damp-proofing prior to commencement of backfilling
- Structural framing - Substantial completion of structural framing and ductwork and piping for heating and air conditioning systems if the building is within the scope of Part 9 Division B. Substantial completion of structural framing for each storey and rough-in of heating, ventilation, air conditioning, and air contaminant extraction equipment for buildings other than Part 9 Division B
- HVAC rough-in - Substantial completion of all ductwork and cold air return spaces
- Exhaust hood systems – during contractor conducted balloon test of fire suppression, and smoke test of ducts
- Plumbing rough-in under slab - Installation of underground building storm drain, sanitary drain, and water supply
- Plumbing rough-in above slab - Installation of drainage system, venting system, and the water distribution system throughout the building
- Insulation and vapor barrier - Substantial completion of the insulation and vapor barriers prior to covering
- Fire separations and closures - Substantial completion of all required fire separations and closures
- Fire protection occupancy - Completion of fire alarm, sprinkler, emergency lighting, and standpipe system
- HVAC occupancy - Installation of required heating and ventilation appliances as required to permit occupancy, as required by the Ontario Building Code
- Plumbing occupancy - Installation of required plumbing fixtures and plumbing appliances as required to permit occupancy, as required by the Ontario Building Code
- Building occupancy - Completion of the construction and installation of components required to permit occupancy, as required by the Ontario Building Code
|